| Perimeter cabinets installed |
| Island installed |
| Coffee bar/Dry bar area on other side of kitchen |
| Countertops installed and that is one big island! |
| Speed cook over/microwave/oven installed |
![]() |
| Just need refrigerator delivered but had to wait until third and final top coat was on hardwood floors |
![]() |
| Countertop on the beverage center |
| Trying to figure out tile design using construction paper! |
| New window finally installed |
| Increased the size of the window from about 2 feet to 4 feet |
| Pantry done |
| Chris, Emma and I installed the new pendant lights -- with very little swearing! |
![]() |
| Laundry room used to extend for another 8 feet but now the pantry is in this space along with refrigerator and ovens. But I designed it so we still had room for a nice coat closet. |
![]() |
| New Refrigerator is in finally and we are so close! |





