I have been very, very delinquent in updating this blog!  I hit a wall just like last time with remodel fatigue and just wanting everything to be over.  They are busy installing the tile and knobs and handles today with final grouting soon and the hood to be installed so I figured I had better post the pictures I did take before it is time to put up final pictures.  



Perimeter cabinets installed





Island installed


Coffee bar/Dry bar area on other side of kitchen

Countertops installed and that is one big island!

Speed cook over/microwave/oven installed

Just need refrigerator delivered but had to wait until third and final top coat was on hardwood floors


Countertop on the beverage center

Trying to figure out tile design using construction paper!
New window finally installed
Increased the size of the window from about 2 feet to 4 feet

Pantry done
Chris, Emma and I installed the new pendant lights -- with very little swearing!


Mud room/laundry room got a fresh coat of paint and Chris painted the cabinets white
After having the dishwasher, refrigerator and beverage refrigerator all squeezed in there for over a month it is nice to have the space back!
Laundry room used to extend for another 8 feet but now the pantry is in this space along with  refrigerator and ovens.  But I designed it so we still had room for a nice coat closet.
New Refrigerator is in finally and we are so close!